Semi-finished surfaces this week include:
Siding
Dry wall
Flooring
It's entirely premature and will have to be rolled up for wrapping the beam, priming and adding trim around the French doors but I needed to see this light at the end of a long, long tunnel.
No comments:
Post a Comment